Concrete
Heavy and rigid, with lifting access required. Check lids, seams and walls for deterioration. The correct base matters, and even a heavy tank can be affected by high groundwater when emptied.
Septic installation and replacement in Orlando starts with the property address and proposed use. We review the approved house layout, tank storage, treatment needs and drain-field area together. County septic approval and city or county building approvals must be coordinated before work begins.
Orlando's summer rain and seasonal groundwater can limit what a drain field will accept. We consider the installed tank, field condition, home layout and county requirements together. Expected service life depends on the product, installation, site conditions and maintenance.
A roughly 1,750-square-foot, three-bedroom home is a useful Orlando-area planning example. Florida uses both building area and bedrooms to calculate design flow. Existing tanks may exceed the minimum; confirm their actual capacity from the county permit record.
| Matched home example | Design sewage flow | Minimum effective tank storage |
|---|---|---|
| 2 bedrooms, 751–1,200 sq. ft. | 200 gallons/day | 900 gallons |
| 3 bedrooms, 1,201–2,250 sq. ft. | 300 gallons/day | 900 gallons |
| 4 bedrooms, 2,251–3,300 sq. ft. | 400 gallons/day | 1,050 gallons |
| Higher design flow of 401–500 gallons/day | 401–500 gallons/day | 1,200 gallons |
When bedroom count and building area do not match, the criterion producing the greater sewage flow controls. Tank gallons are storage capacity, not the daily treatment rate or the field's area. Residential size examples include 900–1,500 gallons; the approved design determines what belongs at your property.
Heavy and rigid, with lifting access required. Check lids, seams and walls for deterioration. The correct base matters, and even a heavy tank can be affected by high groundwater when emptied.
A lighter composite shell that needs correct bedding, backfill and support. Inspect fittings and shell condition, and follow the approved model's groundwater and anchoring instructions.
A molded plastic shell with model-specific burial and installation limits. Incorrect backfill, depth or support can cause deformation. Use a Florida-approved model suitable for the site.
Florida sizing rule · Orlando-area housing benchmark · Orange County permit requirements
Submit the required site evaluation, application, site plan and floor plan to DOH-Orange before installation. Coordinate the approved design and construction inspections with separate building and utility requirements.
Do not assume a new septic system can replace every existing one. Ask the serving utility whether a sewer connection is available or required. Orlando's wastewater policies address conversion from septic, and the answer can depend on the parcel and the proposed tank or field replacement.
A three-bedroom, roughly 1,800-square-foot example has a 300-gallon-per-day design flow and 900-gallon minimum effective storage under Florida's tables. A matched four-bedroom, 2,251–3,300-square-foot example has 400 gallons per day and 1,050 gallons of storage. The more demanding bedroom or area criterion controls.
A site evaluation looks at soil, seasonal high water, elevation and the usable disposal area. Sandy surface soil does not prove adequate separation beneath the field. Lake-adjacent or wetter lots may need fill, dosing or a different approved design. Preserve space for the required unobstructed area.
DOH-Orange is the local septic permitting contact. Prepare DEP4015 application and site plan, the building floor plan, qualified site evaluation and applicable fee. Show property boundaries, buildings, wells, water features, utilities and proposed system locations. Engineering or additional treatment may be needed for the site.
Install the approved product and field layout, arrange the required construction inspection and obtain final approval. Confirm inspection stages before components are covered. Keep the permit, as-built information, tank model and equipment maintenance requirements with the property records.
Confirm whether the address is served by the City of Orlando, Orange County Utilities or another utility before paying for a replacement design. Check DEP mapping for Wekiwa/Rock Springs and other affected basins. The permit authority determines whether conventional or enhanced nutrient-reducing treatment is needed.
Florida requires a qualified site evaluation that addresses soil and seasonal high groundwater, along with the application and plans. The approved design depends on more than how fast water leaves a test hole.
DOH-Orange does not publish a fixed standard turnaround on the reviewed program page. Site evaluation, complete documents, design complexity and revisions affect timing. Confirm the current queue before scheduling construction.
No. Storage capacity and soil treatment are different parts of the design. A larger tank cannot compensate for an unsuitable field.